RFC1
This is a working document with a preliminary proposal, and has not been approved.
RFC 1: Project Steering Committee Guidelines
- Author: GRASS Founding PSC
- Status: Proposed
The GRASS Project Steering Committee (PSC) is proposed to formalize control over the GRASS codebase and to facilitate GRASS project management issues. It is desired to keep the administrative overhead as low as possible.
This document describes how the GRASS Project Steering Committee determines membership and makes decisions on GRASS project issues.
The Geographic Resources Analysis Support System, commonly referred to as GRASS, is a Geographic Information System (GIS) used for geospatial data management and analysis, image processing, graphics/maps production, spatial modelling, and visualization. "The GRASS Project" is defined as the collection of community-managed source code, documentation, sample data sets, and related intellectual property which has been submitted under the terms of the project's license(s) (see Project:Copyrights for details) for shared use.
Terms of Reference
The two primary functions of the PSC are:
1) To enforce control over the GRASS codebase. This can be summarised as:
- a) Enforce mechanisms to ensure quality control.
- b) Ensure compliance with all required legal measures.
2) Project Management and responsibility for the "public face" of GRASS. The PSC is expected to be able to speak and act on behalf of the GRASS project.
Codebase Control
Quality Control Mechanisms
The quality control mechanisms, which are the responsibility of the PSC, currently include:
- Maintaining submitter guidelines and making all developers aware of
them.
- Granting write access to the source code repository for new developers.
- Enforcing the submitter guidelines, with the ultimate sanction against
non-compliance being removal of write access to the source code repository.
In general, once write access has been granted, developers are allowed to make changes to the codebase as they see fit. For controversial or complicated changes consensus must be obtained on the developers' mailing list as far as reasonably practicable. It is recognised that the ultimate arbitration on technical issues always lies with consensus on the developers' mailing list. Specifically, it is not the role of the PSC to impose technical solutions. Its role is limited to enforcing the quality control mechanisms outlined above.
Compliance with Legal Measures
Control over the codebase also extends to ensuring that it complies with all relevant legal requirements. This includes copyright and licensing amongst other issues. The PSC is resonsible for developing rules and procedures to cover this. These are outlined in a separate document: "RFC 2: Legal aspects of code contributions". This document will be updated and revised by the PSC as required.
Project Management
The PSC will share responsibility and make decisions over issues related to the management of the overall direction of the GRASS project and external visibility, etc. These include, but are not limited to:
- Release Cycles
- Project infrastructure
- Website Maintenance
- Promotion and Public Relations
- Other issues as they become relevant
It is the responsibility of the PSC to ensure that issues critical to the future of the GRASS project are adequately attended to. This may involve delegation to interested helpers.
Operation of the PSC
The PSC has its own public Mailing List.
A dedicated Mailing List exists for the purpose of PSC discussions. When a decision is required of the PSC, it will be presented by any member to the mailing list in the form of a proposal. A decision will then be achieved by discussion of the proposal on the mailing list until a consensus is reached. Voting on issues is also permissable and may be used as a means to reach a consensus or, only in case of extreme cases of disagreement, to force a decision. The PSC Agenda lists all open motions. Any member may call a vote on any proposal. That member is then responsible for collating votes and presenting the result to the PSC. The voting procedure is outlined in a separate document: XXXXXXX
(Copy all the +1/0- stuff in there). -> Can somebody please do that, potentially a link to the docuemnt is enough.
Issues that must be voted by the PSC
The following issue(s) *must* have a vote called before a decision is reached:
- Granting source code repository write access for new developers
- Selection of a committee Chair
Prevent Consensus Process from Stalement
It is recognised that the ultimate arbitration on technical issues should always lie with consensus on the developers' mailing list. Specifically, it is not the role of the PSC to impose technical solutions. Its role is limited to enforcing the quality control mechanisms outlined above. In general, once write access has been granted, developers are allowed to make changes to the codebase as they see fit. For controversial or complicated changes consensus must be obtained on the developers' mailing list as far as reasonably practicable. If consensus fails to emerge naturally, issues can be referred to the PSC for more structured efforts to build consensus. As a last resort, if lack of consensus continues, the developer community can request the PSC to choose options best preserving the quality of the GRASS project.
Resolving Deadlock or Break Down
The Chair is the ultimate adjudicator in case of deadlock or irretrievable break down of decision-making, or in case of disputes over voting.
Composition of the Committee
This list could be replace by a link to the PSC page:
Michael Barton, Dylan Beaudette, Hamish Bowman, Massimiliano Cannata, Brad Douglas, Paul Kelly, Helena Mitasova, Scott Mitchell, Markus Neteler, and Maciej Sieczka are declared to be the founding Project Steering Committee.
Addition and removal of members from the committee, as well as selection of a Chair is handled as a proposal to the committee as described above.
The Chair is responsible for keeping track of the membership of the PSC.